Tassel Patterned Blouse Making

Hi ,,

We Now Have introduced you a very easy knit development including 3 steps and on the same time.

This shirt, knitted with the motif of woman wished, liked it either in summer time evenings or in spring. Wear in way of life!

Let’s get started presently!

Foods

FIVE Snowballs Cotton Combine Beige (2199S) colour hand knitting yarn3 mm crochet

Preparation

Sizes are suitable for 36 sizes.

1. a ring is created via pulling and connecting 4 chains. 4 corners in the shape of 3 double handrails, 2 chains, THREE double handrails, 2 chains are created within the ring. The collection ends with a loop shift.

2. THREE double handrails, 2 chains, THREE double handrails are made in each chain hollow space, a nook is created, the opposite chain is passed with 2 chains and the same procedure is repeated. The order is finished by way of knitting on this manner.

3. in this order, motifs are knitted together. In puts the place 2 chains are drawn, 1 chain is pulled, the chain is pulled into the corresponding space of the opposite motif, and the chain is continued. THREE handrails, 2 chains and 3 handrails are made at the corners. within the intermediate spaces, THREE handrails are made and 2 chains are pulled and the other area is handed.

This sweater consists of 42 motifs. 9 + 9 = 18 motifs are used for the front and again, 2 + 2 = FOUR motifs for the sides, 10 + 10 = 20 motifs for the hands.

Finally, tassels are connected to the arm and hem.

puss-motif-blouse-construction

puss-motif-blouse-building

Well Being on your hand!

Source : orgumodelleri.com

You may also like...

Leave a Reply

Your email address will not be published. Required fields are marked *